Project Update | March 6, 2025

A portion of the parking lot of the Pacific Professional Building will be used as a staging area during construction.  To alleviate parking restrictions, additional parking will be opened on Forrest Drive.

Pacific Street Bridge Washout Repair

In 2023 a bridge inspection noted that a large washout occurred on the southwest side of the 107th Street bridge (on Pacific St). A corrugated steel storm sewer pipe had corroded and washed the soil slope into the Big Papillion Creek. This washout endangered both the bridge and the neighboring parking lot. This project is intended to replace the damaged storm sewer pipe, replace the slope, and seed the area.

Project Features

Improvements

  • Replace the damaged pipe with a new HDPP (High-Density Polypropylene) pipe
  • Erosion prevention

Schedule

  • Construction Start: June 2025
  • Construction Complete: October 2025

Document Library

Reports & Studies

Community Engagement

Contact the Project Team

Project Contacts

Everett Owen
Project Manager, Public Works
City of Omaha
402-444-5220
Everett.Owen@cityofomaha.org