Project Update | March 6, 2025
A portion of the parking lot of the Pacific Professional Building will be used as a staging area during construction. To alleviate parking restrictions, additional parking will be opened on Forrest Drive.
Pacific Street Bridge Washout Repair
In 2023 a bridge inspection noted that a large washout occurred on the southwest side of the 107th Street bridge (on Pacific St). A corrugated steel storm sewer pipe had corroded and washed the soil slope into the Big Papillion Creek. This washout endangered both the bridge and the neighboring parking lot. This project is intended to replace the damaged storm sewer pipe, replace the slope, and seed the area.