Project Update | September 2024

This project is complete and fully open to all traffic.

108th Street Improvement Project – Burt to Decatur & Oakbrook Channel Repair Project

The 108th Street Improvement Project aimed to enhance safety, drainage, and pedestrian connectivity by reconstructing the roadway with three lanes and roundabouts at key intersections, along with new storm sewer improvements, ADA-compliant curb ramps, trails, and sidewalks.

Project Features

Improvements

  • Improved safety
  • Improved drainage
  • Pedestrian connectivity
  • Reconstruction to a three-lane roadway (one through lane in each direction with a center turn lane)
  • Roundabouts at North Mill Road, Burt Street, and Mill Valley Road intersections
  • New storm sewer improvements
  • ADA-compliant curb ramps
  • Construction of a trail and sidewalks
  • Addressed streambank erosion and stability concerns in the Oakbrook Channel area

Schedule

108th Street 

  • Preliminary Design: 2020-2021
  • Final Design: 2020-2021
  • Right-of-Way Activities: 2020-2021
  • Utility Relocation: 2021-2022
  • Construction: 2021-Summer 2024

 

Oakbrook Channel

  • Data Collection: 2020
  • Cannel and Site Condition Assessment: 2020
  • Concept Design: 2020
  • Alternative Evaluation: 2020
  • Feasibility Study and Implementation Plan: 2021

Document Library

Reports & Studies

Contact the Project Team

Project Contacts

108th Street Improvement Project
Troy A. Staroscik
Project Manager, Public Works
City of Omaha
402-444-5220
 
Oakbrook Channel Repair Project
Kristi Evans, PE.
Project Manager, Public Works
City of Omaha
402-444-5220
Kristine.Evans@cityofomaha.org