Project Update | September 2024
This project is complete and fully open to all traffic.
108th Street Improvement Project – Burt to Decatur & Oakbrook Channel Repair Project
The 108th Street Improvement Project aimed to enhance safety, drainage, and pedestrian connectivity by reconstructing the roadway with three lanes and roundabouts at key intersections, along with new storm sewer improvements, ADA-compliant curb ramps, trails, and sidewalks.
Project Features
Improvements
- Improved safety
- Improved drainage
- Pedestrian connectivity
- Reconstruction to a three-lane roadway (one through lane in each direction with a center turn lane)
- Roundabouts at North Mill Road, Burt Street, and Mill Valley Road intersections
- New storm sewer improvements
- ADA-compliant curb ramps
- Construction of a trail and sidewalks
- Addressed streambank erosion and stability concerns in the Oakbrook Channel area
Schedule
108th Street
- Preliminary Design: 2020-2021
- Final Design: 2020-2021
- Right-of-Way Activities: 2020-2021
- Utility Relocation: 2021-2022
- Construction: 2021-Summer 2024
Oakbrook Channel
- Data Collection: 2020
- Cannel and Site Condition Assessment: 2020
- Concept Design: 2020
- Alternative Evaluation: 2020
- Feasibility Study and Implementation Plan: 2021
Document Library
Reports & Studies
Community Engagement
February 2021 Public Meeting
June 2020 Public Meeting
Contact the Project Team
Project Contacts
108th Street Improvement Project
Troy A. Staroscik
Project Manager, Public Works
City of Omaha
402-444-5220
Oakbrook Channel Repair Project
Kristi Evans, PE.
Project Manager, Public Works
Kristi Evans, PE.
Project Manager, Public Works